Close Menu

    Subscribe to Updates

    Get the latest Tech news from SynapseFlow

    What's Hot

    College Students Losing Ability to Participate in Class Discussions Since They Offloaded Their Thinking to AI

    April 7, 2026

    Higgsfield bets on AI-generated series with viewer-picked originals push

    April 7, 2026

    Latest Xperia 1 VIII renders confirm new camera island design

    April 7, 2026
    Facebook X (Twitter) Instagram
    • Homepage
    • About Us
    • Contact Us
    • Privacy Policy
    Facebook X (Twitter) Instagram YouTube
    synapseflow.co.uksynapseflow.co.uk
    • AI News & Updates
    • Cybersecurity
    • Future Tech
    • Reviews
    • Software & Apps
    • Tech Gadgets
    synapseflow.co.uksynapseflow.co.uk
    Home»Future Tech»AI Will Give Humanity the Moon, Mars and Supersonic Travel
    AI Will Give Humanity the Moon, Mars and Supersonic Travel
    Future Tech

    AI Will Give Humanity the Moon, Mars and Supersonic Travel

    The Tech GuyBy The Tech GuyApril 7, 2026No Comments4 Mins Read0 Views
    Share
    Facebook Twitter LinkedIn Pinterest Email
    Advertisement


    Boom Supersonic has secured one major public sales order for its Superpower 42 MW natural gas turbines aimed at AI data centers. They will sell 29 units totaling 1.21 GW from launch customer Crusoe (announced December 9, 2025), creating a $1.25 billion backlog.

    Advertisement

    Boom closed a $300 million funding round led by Darsana Capital Partners with participation from Altimeter Capital, ARK Invest, Bessemer Venture Partners, Robinhood Ventures, and Y Combinator. This new funding, along with revenue from Superpower, fully supports development of the Overture supersonic airliner.

    Screenshot

    Supersonic aircraft startup will make billions in profit and dozens of their engines before being able to fly their supersonic commercial passenger plane.

    This is part of trillions per year being spent on AI data centers and energy for AI. The trillions being spent on AI will give humanity the funding for millions and billions of AI data center satellites, moon bases, moon industrialization, Mars colonization and thousands of SpaceX Starships. The Boom Supersonic AI deal will ensure that Boom has profitability to reach a viable supersonic commercial passenger planes. The dozens to hundreds of early engines for AI power will let the factories get built and funded and the engineering experience in building and perfecting the engines.

    Screenshot

    Crusoe is paying approximately $1,033 per kW of generating capacity (roughly $43 million per 42 MW unit). The price covers the full packaged system: the Superpower aeroderivative turbine (derived from Boom’s Symphony supersonic engine core), paired generators (BRUSH DAX 7 from Baker Hughes), controls, and preventative maintenance. It is a containerized, dual-fuel (natural gas primary + diesel backup) unit with 39% simple-cycle efficiency.

    In February, 2026, Baker Hughes (NASDAQ: BKR), an energy technology company, announced an award to supply 25 BRUSH™ Power Generation electric generators, along with Automatic Voltage Regulators (AVRs) and cubicles to Boom Supersonic. These specialized generators will be paired with Boom’s innovative 42 megawatt (MW) Superpower natural gas turbines to deliver highly efficient and reliable electricity for advanced AI data centers.

    BRUSH™ Power Generation DAX generators are 2-pole, air-cooled units renowned for their high efficiency, flexibility, and lower total cost of ownership. These units are specifically engineered to meet demanding operational requirements, with a proven track record from over 3,500 active installations worldwide. Including six generators already on order, Boom has now placed firm orders for 31 generators totaling 1.3GW, with deliveries starting mid 2026 through 2028.

    Better Price Performance Than Comparable Generators

    Boom positions Superpower as offering dramatically better real-world price/performance versus traditional aeroderivative gas turbines due to supersonic-derived materials and design. It will maintain full 42 MW output even at ambient temperatures over 110°F (no derating or water cooling needed, unlike competitors that lose 20–30% capacity in hot conditions).

    14-day installation window once site work is complete.

    Quick-deploy, behind-the-meter solution optimized for AI/HPC loads.

    All-in EPC / installed costs for data-center projects are often $1,200–$2,500/kW (or higher) due to the ongoing supply crunch—gas turbine prices have surged ~195% since 2019.

    Typical aeroderivative gas turbines GE LM2500XPRESS / LM6000-class, Siemens SGT-A45, ~40–50 MW range) hardware/package costs run $930–$1,500/kW.

    Delivery Timeline

    First Superpower unit to Crusoe: 2027.
    Phased rollout for the 1.21 GW order: ~200 MW by 2027, ~1 GW in 2028, ~2 GW by 2029.

    Boom plans to ramp production to over 4 GW per year by 2030 via a new Superpower Superfactory (manufacturing already started on initial units and production equipment).

    linkedin.com +1

    Brian Wang is a Futurist Thought Leader and a popular Science blogger with 1 million readers per month. His blog Nextbigfuture.com is ranked #1 Science News Blog. It covers many disruptive technology and trends including Space, Robotics, Artificial Intelligence, Medicine, Anti-aging Biotechnology, and Nanotechnology.

    Known for identifying cutting edge technologies, he is currently a Co-Founder of a startup and fundraiser for high potential early-stage companies. He is the Head of Research for Allocations for deep technology investments and an Angel Investor at Space Angels.

    A frequent speaker at corporations, he has been a TEDx speaker, a Singularity University speaker and guest at numerous interviews for radio and podcasts.  He is open to public speaking and advising engagements.

    Advertisement
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    The Tech Guy
    • Website

    Related Posts

    College Students Losing Ability to Participate in Class Discussions Since They Offloaded Their Thinking to AI

    April 7, 2026

    Drought Parches Florida – NASA Science

    April 7, 2026

    The First Fault-Tolerant Quantum Computer by 2028

    April 7, 2026

    The Moon Astronauts Just Broke the Record for the Farthest Any Human Has Ever Traveled From Earth

    April 6, 2026

    NASA Orion Astronauts Will Go Over 252000 From Earth to Beat Old 248,655 Mile Record

    April 6, 2026

    Thinking of You, Earth – NASA

    April 6, 2026
    Leave A Reply Cancel Reply

    Advertisement
    Top Posts

    The iPad Air brand makes no sense – it needs a rethink

    October 12, 202516 Views

    ChatGPT Group Chats are here … but not for everyone (yet)

    November 14, 20258 Views

    Facebook updates its algorithm to give users more control over which videos they see

    October 8, 20258 Views
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Advertisement
    About Us
    About Us

    SynapseFlow brings you the latest updates in Technology, AI, and Gadgets from innovations and reviews to future trends. Stay smart, stay updated with the tech world every day!

    Our Picks

    College Students Losing Ability to Participate in Class Discussions Since They Offloaded Their Thinking to AI

    April 7, 2026

    Higgsfield bets on AI-generated series with viewer-picked originals push

    April 7, 2026

    Latest Xperia 1 VIII renders confirm new camera island design

    April 7, 2026
    categories
    • AI News & Updates
    • Cybersecurity
    • Future Tech
    • Reviews
    • Software & Apps
    • Tech Gadgets
    Facebook X (Twitter) Instagram Pinterest YouTube Dribbble
    • Homepage
    • About Us
    • Contact Us
    • Privacy Policy
    © 2026 SynapseFlow All Rights Reserved.

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.